• Home
  • About Us
  • Plans
  • Trade
  • Gallery
  • Contact Us
Menu
  • Home
  • About Us
  • Plans
  • Trade
  • Gallery
  • Contact Us
  • FA
  • EN
  • Home
  • About Us
  • Plans
  • Trade
  • Gallery
  • Contact Us
Menu
  • Home
  • About Us
  • Plans
  • Trade
  • Gallery
  • Contact Us
02191008797
Search
Close
  • FA
  • EN

Gas Delivery

Gas Delivery

With the coordination and presentation of the honorable CEO of the company Mr. Dr. Zangoui Nejad last week, the location of the Hot Tab and the branching of the feed and gas transmission line of the complex was determined and finalized.

Steps to do the work:

1- Identifying and visiting the field and specifying the location of the sounding in order to comply with safety principles during drilling

2- Sounding and access to the pipe location by the contractor approved by the gas department and the gas transmission company.

3- Manual digging of suitable points (smooth pipeline path) by observing safety principles

4- Radiographic operation to find the longitudinal seam of the pipeline

5- After confirming the proper location of the pipe seam, remove the pipe insulation in the appropriate length and approved by the gas department and the gas transmission company

6- Test (lamination test) to check the condition of the pipe in terms of corrosion

7- Re-covering the pipe with proper insulation according to the announced standards

8- The excavated place was back filled with suitable materials.

By carrying out the above operations, while finalizing the branching location of the integrated gas line (300.19 kilometers of the 20-inch line from Andimeshk to Dehlran), the pressure of the line that is supposed to supply the complex in the future was determined, and today we know that the pressure of the line in question is between 650 and 700 psi and this pressure will decrease in the following years and this should be considered in the design.

  • kimia-andimeshk
  • No Comments

Share It:

Facebook Twitter Envelope Whatsapp
  • Useful Articles
Loading...

2019 May

  • Iftar ceremony with the presence of the managers of Kimia Andimshek Petrochemical Industries Company, the Honorable governor of Andimeshk and a group of city officials.
In  May 2019, after visiting the projects progress and holding...
Read More

2019 February 21

  • Kimia Andimeshk Petrochemical was picked up
Minister of Cooperation, Labor and Social Welfare said: Petrochemical project...
Read More

2019 May

  • Site Visit of managers of Kimia Andimshek Petrochemical Industries Company
Managers of Kimia Andimeshk Petrochemical Industries Company visited the project...
Read More
  • Share Your Opinion With Us

Leave a comment

Cancel reply

Your email address will not be published. Required fields are marked *

Our Colleagues

About US

The Mission:

“Creating Value Chain from Methane Gas, Preventing National Capital Markets in Selling raw resources and Creating More Value Added investments and Moving towards the Resistive Economy”.

Contacts

  • 02191008797
  • Site Of Projest: KM 22 Of Karkheh Dam Road, Andimshek.
  • 6483162093
  • Central Office: NO.6, Zagros Building, Before sadr Highway, North Dibaji Street, Farmaniyeh, Tehran, Iran.
  • 1951935717
  • info@kpiir.com
  • Found US In Google Map
Instagram Telegram Whatsapp Envelope

Useful links

  • Home Page
  • Kimia Andimeshk Projects
  • Ministry of Petroleum
  • National Petrochemical Company (NPC)
  • Ministry of Industry, Mine and Trade
Kimia Andimeshk petrochemical newsletter

Enter your email to receive the latest news

Website Design By Eepek